Ceramic roller replacement handover checklist
Give maintenance, engineering and purchasing the same replacement record before confirming an order.

Identify the furnace line, roller position and drawing revision. Keep the measurements, end-view photos and proposed replacement together. Ask engineering to review differences in dimensions and interfaces before purchasing confirms the quotation.
Before work starts, confirm who is responsible for receiving inspection and who will compare the replacement against the approved drawing. Follow the furnace manufacturer's procedures and your plant's safety requirements for installation, alignment and restart. Record the confirmed configuration with the maintenance team so the next replacement can start from that record.
HUATAO
Fused Silica Ceramic Roller
Horizontal Glass Tempering